OOC Discussion

Okay - so shall I advance to the end of Spring/Summer 1230, leaving Autumn 1228 blank for now? Are you planning to run the tribunal and 1230 story simultaneously or in parallel? (I'd probably prefer in parallel if you're expecting the tribunal story to be relatively inconsequential, so we can get time moving, but it depends on how quick you expect it to be and whether there is likely to be anything in it which would be likely to affect future development in it).

I suspect by the time he's got to and participated in the tribunal, it'll be well past 10 days?

Unfortunately some of the old posts detailing their construction appear to have gone missing - there's a link to them, but it doesn't go anywhere useful. However, there was a blacksmith's workshop, carpenter's workshop and infirmary built as of Spring 1228. Gregorius described them to Stephan as follows:

I think the plan was to next create a barracks and a mason's workshop - I think those can both be done by the end of 1228, so I might alter the "selling the stone" plan to not start until after they're built, as a barracks in particular would be useful (the existing buildings are rather cramped), and the mason's workshop will help us get to proper export levels. Of those, the mason's workshop will be down at the quarry, and the barracks in the main clearing with some space outside it for a training yard.

Edit: I think this is what I was looking for: Covenant Development - #254 by Salutor

Which says 3 lots of building materials after the carpenter's and blacksmith's workshops are done, so that being the infirmary plus a future barracks and mason's workshop seems consistent.